15.01.2008 Demolition of buildings and structures of Kalynivka Logistics Center. Concrete processing. Employer – Kalynivka Logistics Center. |
|
15.10.2007 Demolition of buildings and structures of Lviv Loader Factory. Employer – Construction Department 137. |
03.2007 Demolition of Berezan House Building Factory facilities (Berezan, Voikova Str. 44 а). Processing into secondary crushed stone. Employer – Aerok LLC. |
|
02.2007 Demolition of production facilities and cleanup of the area of Kineskop Lviv Factory. Employer – Vash Dim LLC. |
09.2006 Processing of concrete surface into secondary crushed stone. Illichivsk Commercial Seaport. Jobsite area: 7.8 ha. Employer – Ukrtranscontainer PV. |
|
09.2006 Demolition of 9 buildings of Golden Beach Sanatorium. Volume of solid mass: 11,000 m3. Yalta, Livadia. Employer – Standardinvest IC. |
03.2006 Demolition of Victoria Sanatorium in Yalta. Processing of concrete into secondary crushed stone. Employer – Golden Beach OJSC. Engineering: Q-tec. |
|
2006 Receipt and processing of broken concrete at the processing site located at Yakutska Str. 9. |
05.2006 Dismantlement and removal of assembled reinforced concrete building of a motor transport enterprise. Kyiv, Mekhanizatoriv Str. 2. Preparation of construction site for Izumrudnyi apartment complex. |
|
02.2006 Processing of heavily reinforced concrete tubes into secondary crushed stone at Metrobud JSC site. |
10.2005 Demolition of Aurora Movie Theater. Employer – Kvadrat Ukraine LLC. General Contractor – Altis HC. KVADRAT Retail Center in Kyiv at Perova Str. 36. |
|
06.2005 Demolition of industrial floors in a warehouse complex located at Gaidara Str. 54 in Kyiv. Employer – Kyivtextile OJSC. Area – 1500 m2. |
07.2006 Deconstruction of Ukraine Factory buildings at Henri Barbusse Str. 37/1 in Kyiv. General Contractor – Aerobud JSC. Volume – 80,000 m3. |
|
06.2006 Demolition of production facilities at Promyslova Str. 2 in Kyiv. Employer – Etoile LLC. |
09.2005 Deconstruction and recycling of concrete reservoirs of water preparation plant. Demolition of heavy foundations for production department equipment. Khimvolokno OJSC. |
|
07.2005 Demolition of foundations at Fizkultury Str. 28 in Kyiv. Employer – OKSI LLC. |
05.2005 Dismantlement of air raid shelter at Dragomirova Str. 4-B in Kyiv. Employer – Ukrbudinvest-1. |
|
04.2005 Demolition of three old five-storey buildings. Construction of an office and apartment complex at B. Khmelnytskoho Str. 19-21. Employer – Yaroslavov Val LLC. General Contractor – Aerobus JSC. |
|
|
|